PRODUCTION & REORDERS

SAME PROCESS.
SAME SUPPLIER.
EVERY TIME.

Once a part is validated and delivered, it enters a locked production process. Reorders don't start from scratch — they run on the same routing, the same supplier, with the same documentation.

Most repeat supply failures come from resourcing the same part to a different supplier. We prevent that by locking the process after first article approval and managing all repeat orders against a fixed baseline. Documentation ships with every batch — no chasing paperwork.

THE REORDER PROCESS

HOW REORDERS
WORK

01

Part Enters Managed SKU Catalog

After first article approval, the part is assigned a SKU in our system. Supplier, routing, revision level, inspection plan, and documentation requirements are all locked. No resourcing. No re-quoting the process.

02

You Submit a Reorder

Send quantity and delivery target. That's it. We already have the drawing, the supplier, the inspection plan, and the documentation requirements on file. No re-explaining the part on every order.

03

Production Runs Against Locked Baseline

The same supplier produces to the same approved revision. Batch inspection runs against the same criteria established at first article. Any deviation is caught before shipping — not after it arrives.

04

Batch Documentation Ships With Parts

Every production batch includes CoC, material certs, and inspection report. Same format, every time. You don't request it — it comes with the shipment.

05

Revision Changes Trigger a New Cycle

If your drawing changes, we flag it. The new revision goes back through first article before production continues. We do not run new revisions on the old approval. Your records stay clean.

WHAT GETS LOCKED AFTER FIRST ARTICLE

YOUR BASELINE IS PROTECTED.

The approved revision, the qualified supplier, the inspection plan, and the documentation requirements are all recorded at first article. Every reorder runs against that baseline. Nothing changes without a documented reason.

WHAT COMES WITH EVERY BATCH

DOCUMENTATION ON EVERY SHIPMENT

  • Certificate of Conformance (CoC)
  • Material certification
  • Batch inspection report
  • Revision level confirmation
  • Quantity verification record